Explore our past projects to see the dedication, care, and expertise we bring to every job. Through photos and brief descriptions, we showcase our commitment to building stronger, safer communities—one project at a time. At Levanen Underground, safety is more than a priority; it’s the foundation of everything we do.

20230912_210355205_iOS.heic

Phase One

Water System Improvements
Webster, SD

This project was our largest and latest completion in 2023. The project started in the spring of 2022 and consisted of 3 miles of 1" water line, 493 new water services connections,  2,958 feet of 4" sewer line, 91 new sewer connections, and aprox. 2000 ft of water main. Just over $1M for our portion and we were sub contracted from B&B Contracting Inc.

Westside Condos
Delano, MN

WestSide Condos was one of our many commercial projects. Consisting of 530' of Sewer main, 560' of 6" Water main, two Hydrants and a complete Storm system with 7 manholes. We were able to preform this project early spring before the summer rush.

36FD95E5-D7F4-4EFF-88F7-10A17333FB0D_edi
IMG_2788_edited.jpg

Sibley State Park Amphitheater
New London, MN

Sibley State Park was our first state project in the books and was preformed at Sibley State Park, MN. This exciting project started in the spring of 2021. It entailed removing the old amphitheater and adding this beautiful curved rock retaining wall. A fire pit near the bottom. Later, benches and lighting were added.

Sanitary Sewer replacement
Minnetrisa, MN

One of many local sanitary sewer repairs! This project was performed for the city of Minnetrisa, MN in the spring of 2023. This picture is from the beginning of the project; we had a continual sewage by-pass system in place to preform this repair.  

IMG_2609.HEIC
63642597007__3DC8E55F-0815-45A8-905B-AB65CE6ABE2C 1.HEIC

Forced main Sewer Repair
Darwin, MN

Emergency work; Sewer repair project for the city of Darwin. This project had a damaged 6" sewer forced main and we only had short intervals to preform the repair before the city had sewage backup damage.

Sewer  Improvements Herried, SD

This project was started and complete in the summer of 2020. Consisting of 66 sewer services and 2,838 feet of new 4" sewer line. For the city of Herried, SD. Subcontracted off of B&B Contracting Inc. 

IMG_2080_edited.jpg
IMG_2496.HEIC

1 Mile of 15" HDPE Water main
 

This project I hired on and operated. The main focus was to learn and understand how to preform large diameter HDPE installation on rough and rugged terrain. The pipe was fused together using a off road induction fuser.

Michael Court Apartments
Hutchinson, MN

This project was packed with exciting challenges and one of our commercial project in Hutchinson, MN. Some of the challenges we had were deep sewer tie-ins. High water table and slimy clay. But we all enjoy these types of challenges on every project. 